What are some options for repairs?

Please review the table alongside the graph below which explains the risk level for these options.

SCENARIO COST
WHAT DOES THIS MEAN FOR ME?
A. Current: minimal repairs only at critical sites Cost: $280K

$159K already spent
on urgent repairs
  • Critical sites: this is a short-term solution. Following minimal repairs these sites would be risk level 2 (yellow).

  • Other damaged sites: the other nine damaged sites have a higher risk of additional erosion and flooding. These sites would be risk level 3 (red).

  • All lower Waitaki rating district residents: if only the minimum urgent works are done there would be a moderate risk of flooding – slightly higher than pre-flood levels. This is because the remaining eroded sites are more vulnerable to flooding, which can spread over a wide area.
B. Full repairs at the four critical sites only Cost: $700K
  • Critical sites: protection would be restored to pre-flood levels at critical sites only. These four sites become characterised as risk level 1 (green).

  • Other damaged sites: private landholders at the other nine sites have a higher risk of additional erosion and flooding. These sites would be risk level 3 (red).

  • All lower Waitaki rating district residents: repairing these sites would alleviate the majority of community flood risk. All lower Waitaki residents return to a lower risk of flooding. Risk level 1 (green).
C. Full repairs at each of the 13 sites Cost: $1.04 million
  • All lower Waitaki rating district residents: risk level 1 is restored for all sites. Protection restored to pre-flood levels.